One of the main tenets of the Theory of Constraint is that you need to move the resources (staff) to the areas that are bottlenecks. And if that means leaving a piece of equipment idle, while resources are focused on the bottleneck, then that is better use of resources. Running a non-bottlenecked resource continuously to create a high utilization rate for that one piece of equipment can result in lower overall throughput.