Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
Hold on a moment. Suppose I took those 10 sample sets, computed the averages of the data, found the standard deviation of the samples from the average, multiplied it by three, then added and subtracted it from the average to arrive at upper and lower control limits.
That sounds like SPC (Statistical Process Control) Shewhart Charts, doesn't it?
0 Comments
View Comments
- People:
- Dickeson--Cyan
- Magenta
- Places:
- Atlanta
Related Content
Comments