Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
The company took a team approach to designing P7. "We learned from past experience by getting P5 (Greenwood's first plate line) operators involved in design and development of the new line," Davis explains.
One such insight led to circulation and mixing tanks being moved off to the side rather than locating them below the line, since operators reported that dripping from above had caused damage to those components of the P5 line.
0 Comments
View Comments
- Companies:
- FUJIFILM Graphic Systems Div.
- Places:
- Fujifilm-South Carolina
Related Content
Comments