Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
What you can do something about is loading and scheduling. First thing, re-read The Goal, by Goldratt. Put the slowest boy first in line. Learn the drum-buffer-rope system of scheduling. I'll bet you our slowest boy is either paper raw material or collection of receivables. Identify the greatest time constraint. Chop it down with BHAGs. Then on to the next and the next. Somewhere down the line you'll come to the WIP. Don't worry about slow presses until the other BHAGs have been cut down to size.
0 Comments
View Comments
Related Content
Comments