Merrick Makes a Connection With Digital Printing
Facebook
Facebook
Twitter
Twitter
LinkedIn
LinkedIn
Email
Email
0 Comments
Comments
Transmitting at 10MB per second, NMLI can make digital jobs move faster than the thoroughbreds that tear up the track at Churchill Downs. Unfortunately, only a mile of the necessary fiber optic cable was in place. Merrick needed another two miles to make the connection complete.
Bell South normally requires two to three months to bury that much cable. Merrick didn't have two to three months. DPI's new facility was scheduled to begin production in a month, so Merrick needed the line laid in four weeks.
0 Comments
View Comments
- Companies:
- Muller Martini
- Xerox Corp.
- People:
- David Merrick
- Kentucky Derby
- Places:
- Louisville
- LOUISVILLE, KY
Related Content
Comments