Millennium Press Reaps Benefits from Integrated Workflow
Sullivan had these further observations:
• No CSR was involved. Because the DirectAccess shopping cart was used, “The job specifications were already loaded and the estimate linked to those specifications, so the customer knew the price up front.”
• The job was in prepress for less than 10 minutes. “Had the customer’s geometry been correct, even less time would have been needed.”
• The Suprasetter 105 MCL ran unsupervised, thanks to the platesetter’s automatic loading and stacking features.
• Just one operator was required to man the Speedmaster SM 75 Peak Performance Press with Inpress control, “one of the most amazing products to hit the press since the introduction of closed-loop, color-reading systems,” Sullivan said. “It takes the pressman’s focus off the task of watching color so he can concentrate on overall sheet quality.”
• Cutting data was sent automatically from Prinect Prepress Manager to Millennium’s Compucut software to the POLAR 115XT Autotrim knife, saving time, lowering costs, and enabling uninterrupted production.